Project Management

Ensuring projects are delivered on-time and bring added value to our clients

Total Cost of Ownership from the outset

We assists engineering contractors, modular skid manufacturers and plant owners with control valve sizing and selection as well as on/off valves and automated packages. This enables the end user to maximise process control without compromising safety, reducing unscheduled down time or incurring excessive maintenance costs. Total Cost of Ownership for the end user is at the forefront of our minds when embarking on any project. Our projects team will help you determine the right products that fit the needs of your project. We are in partnership with global manufacturers of automatic recirculation (minimum flow) valves, control valves: ball, butterfly, plug, needle, gate, globe and check valves and ancillary equipment, which maintain control with smart flow control solutions.

Expediting

We pride ourselves on achieving on-time deliveries. We achieve this by liaising with and if necessary, visiting the manufacturer and sub-suppliers to monitor orders at critical stages during the production and reporting on progress against a pre-determined manufacturing plan. We report back to our clients on a regular basis to ensure that if any slippages occur in the scheduled delivery, it can be recovered as quickly as possible. Our main objective is meeting our client’s delivery schedule whilst maintaining our high quality standards.

Documentation

We supply a comprehensive range of documentation which can be tailored to suit specific customer’s requirements. Including but not limited to:

  • General Arrangement Drawings
  • BOM
  • Production Schedule
  • Inspection and Test Plans
  • Quality Plans and Manuals
  • Testing Qualifications and Procedures.
  • 3D Modeling Drawings

      Other documentation is available on request.

Tests and Approvals

  • DIN EN ISO-9001-2008
  • Druckgeräterichtlinie (PED) 97/23EG
  • Modul H/H1, CE0036
  • DIN CERTCO
  • TA-Luft
  • Vd-TÜV Wasserstand 100
  • DVGW
  • ATEX Konformitätserklärung, 94/9/EG
  • TR TS (EAC)
  • LR- Lloyd’s Register
  • GL Germanischer Lloyd
  • BV-Bureau Veritas
  • DNV-Det Norske Veritas
  • RINA-Registro Italiano Navale
  • ABS-American Bureau of Shipping